Checklist: Health and Safety Risk assessment Template
5 minutes, 57 seconds read
HEALTH AND SAFETY RISK ASSESSMENT TEMPLATE
PPE
Are PPE requirements sufficient? -Should gloves be required? -Should a face shield be required?
Safe | At Risk | N/A
Is PPE supplied adequate for the task? -Previous injuries when using current PPE? Why? -PPE being replaced excessively? (e.g. Burn holes, soaked with liquid chemicals, etc.)
Safe | At Risk | N/A
Is PPE being worn properly? -Ear plugs completely inserted into ears -Safety glasses fit properly and pass fit test (gaps no larger than width of finger) -Gloves being worn when handling materials that are sharp, hot, etc.
Safe | At Risk | N/A
PPE supplies readily available to operators (Interview >= 2 employees.)
Safe | At Risk | N/A
Tools/Machinery/Equipment
Are all tools in good working condition? -Held together with tape? -Excessive noise/vibration? -Requires excessive manual manipulation?
Safe | At Risk | N/A
All existing guarding in place? -Guards laying on the floor? -Bolts/Screws missing from fixed guarding? -Guards shifted causing open point of operation?
Safe | At Risk | N/A
Existing guarding sufficient in preventing access to the point of operation? -Gaps in guarding too large? -Use of chains as barrier guarding? -Interlocked/Presence sensing devices not working properly? -No guard installed where it should exist?
Safe | At Risk | N/A
Machinery working properly and not causing regular manual manipulation? -Frequent breakdowns causing manual work? -Machinery producing excessive noise/vibration due to disrepair?
Safe | At Risk | N/A
Machinery design/layout inherently hazardous? -Congestion created in design? -Equipment no longer safest design for the process? -Can a hazardous piece of equipment be eliminated from the process/work area?
Safe | At Risk | N/A
Hazard Communication
Employees know how to find MSDS and understand the hazards of the chemicals they work with. (Interview >=2 employees)
Safe | At Risk | N/A
Ventilation adequate for the airborne health hazards? -Industrial hygiene sampling results on file? -Employee complaints about “fumes” or “nausea/dizziness”
Safe | At Risk | N/A
Chemicals are stored in proper containers and labeled properly? -Secondary containers that are not in control of current shift labeled with HMIS label or equivalent? -Labels legible and accurately indicates the chemical that is inside the container?
Safe | At Risk | N/A
Incidental spills cleaned up immediately? -No evidence of spills being left? -Chemicals being tracked on employees’ shoes and/or mobile equipment?
Safe | At Risk | N/A
Chemicals stored properly? -Flammable materials not in use stored in proper cabinet/safety container? -Incompatible materials stored away from each other?
Safe | At Risk | N/A
Walking/Working Surfaces and Fall Protection
Proper labels in place and legible? -Portable ladders and stairways require labeling indicating weight limits.
Safe | At Risk | N/A
Floors and work platforms free of excessive debris and clutter? -Excessive oil, trash, manufacturing byproducts, etc. in the work are? -No items stored on stairs?
Safe | At Risk | N/A
Handrails secure and free of excessive defects? -Heavily damaged handrails that require replacement? Loose? Broken welds? Bent handrails and/or toe boards? -Handrails do not contain excessive oil/grease?
Safe | At Risk | N/A
Handrails installed where a fall from a height of four feet or greater exists?
Safe | At Risk | N/A
Fall protection equipment available for working at heights greater than 4 feet from the working surface below it where fall prevention is not available?
Safe | At Risk | N/A
Harnesses, lanyards, SRL, and lifelines maintained in good condition and inspected properly? -Inspection labels present and legible? -Webbing free of frayed, cut or broken fibers? -Quick connect buckles working properly?
Safe | At Risk | N/A
Emergency Response/Fire Protection
Fire extinguishers inspected monthly and unblocked?
Safe | At Risk | N/A
Employees aware of emergency procedures and where assembly areas are? (Interview >=2 employees)
Safe | At Risk | N/A
Eyewash/Safety Shower stations inspected and unblocked?
Safe | At Risk | N/A
Spill kits are available where needed and are equipped/inspected as required?
Safe | At Risk | N/A
Sufficient emergency equipment installed in the area? -Fire extinguishers, eyewash, safety shower, spill kits, alarm pull stations, etc.
Safe | At Risk | N/A
Fire suppression systems not blocked/damaged?
Safe | At Risk | N/A
Mobile Equipment
Equipment inspected per inspection frequency requirements?
Safe | At Risk | N/A
Operators using horns and warning devices where required?
Safe | At Risk | N/A
No passengers on equipment designed for operators only?
Safe | At Risk | N/A
Electrical Hazards/Arc Flash
High voltage signs in place and visible?
Safe | At Risk | N/A
Debris/Tools stored on top of electrical cabinets?
Safe | At Risk | N/A
Electrical cabinets closed and in good repair? -Do the cabinets close securely? -Knock-outs all in place? -Large dents in the housing/door?
Safe | At Risk | N/A
Electrical cabinets not blocked? -Nothing within 36 inches of the front of the cabinet? -Clear access/pathway to electrical cabinets?
Safe | At Risk | N/A
Arc flash signage in place? -Indicates arc flash category?
Safe | At Risk | N/A
Proper arc flash PPE available and in use?
Safe | At Risk | N/A
Hazardous Energy Control (Lockout/Tagout)
Employees expected to conduct lockout trained and equipped properly? -Employees understand their role and requirements? -Employees have locks available if needed?
Safe | At Risk | N/A
Employees locked out during a change over and/or other tasks that require lockout? -All employees who are working on the equipment have their own lock affixed to the proper energy source(s)? -Lockout was verified, stored energy was dissipated and equipment will not operate?
Safe | At Risk | N/A
Energy control procedures exist for all equipment in the area and employees know where to find them?
Safe | At Risk | N/A
Lockout exceptions have been adequately evaluated and determined safe? -Do regular tool/machine adjustments introduce hazards with unacceptable risk? -Other exceptions?
Safe | At Risk | N/A
Crane/Hoist Safety
Inspections completed as per requirements? -Operator inspections completed? -PM’s completed as per the schedule?
Safe | At Risk | N/A
Are employees working under suspended loads?
Safe | At Risk | N/A
Are cranes working within their operating limits? -Capacity not exceeded? -Upper limit switch not used as a stop?
Safe | At Risk | N/A
General Safety and Housekeeping
Trash, debris, and equipment not left laying around?
Safe | At Risk | N/A
Equipment free of excessive dust, oil and/or soot?
Safe | At Risk | N/A
Floor surfaces covered in oil/dust covering the painted surface?
Safe | At Risk | N/A
General tripping hazards due to housekeeping, equipment layout, and/or workstation design?
Safe | At Risk | N/A
Signature and Finalization
I have completed this assessment to the best of my knowledge. This audit is not intended to identify all safety and health hazards, but to identify all visible/known hazards as of the date printed on the completed assessment. assessment.
Select date
General Comments
Overall Safety Score
Prev chapter: Checklist: Hazard Communication (HazCom) Compliance ChecklistNext chapter: Checklist: Incident Cause Analysis Method (ICAM) Template